Project of developing and upgrading High, Medium and Low Voltage Electrical networks at King Abdul Aziz Port Dammam, the major importance is to bring Improvement & augmentations of the power system 13.8/ 0.4 to 0.5 kV to cater for the load requirements and enhance the capacity as per requirement of customer considering the future requirements of 30 years. This power distribution system 13.8/0.4 kV is completely equipped with all controlling and monitoring through SCADA System.
And taking into consideration the easy way of maintenance and safeties requirement, which will more convenient to operate the system and also will be environmental friendly.